Installing a new HAR-TRU® clay court is quick and cost-efficient. A layer of finely crushed, green rock particles is simply installed over a porous base of crushed stone aggregate to produce a finished surface. Even after years of play, HAR-TRU courts remain free of bumps, pits, buckles and cracks. Every HAR-TRU court is backed by a full complement of engineering and design services as well as onsite technical consultation.
1. Prepare the subgrade.
2. Install the piping and cells for the HydroCourt® sub-irrigation
system or piping for above-ground sprinkler system.
3. Cover the subgrade with a porous, crushed stone base layer for
stabilization and proper drainage.
4. Connect interior and exterior piping. Set and connect the
HydroCourt fill boxes.
5. One-inch layer of HAR-TRU is evenly dispersed over the entire
surface and then rolled.
6. Center anchor and net posts are retrofitted to industry specifications.
7. Line tapes are installed.
8. In as few as ten days, your HAR-TRU clay court is ready for play.